docs(10-06): summary — Phase 10 complete, with the gate-effectiveness caveat

All five KEY-05 layers landed. Records the two things a reader would
otherwise get wrong:

- the 2 boot_reconciler test failures in the full-suite run are
  parallel-load flakes (4/4 pass in isolation), not regressions;
- layer (b)'s clippy gate is LIVE but not yet EFFECTIVE, because 42
  pre-existing warnings already fail the same -D warnings step.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
archipelago
2026-08-02 17:00:14 -04:00
co-authored by Claude Opus 5
parent a3283cffb4
commit a850bb6cdd
2 changed files with 120 additions and 9 deletions
+9 -9
View File
@@ -5,15 +5,15 @@ milestone_name: milestone
current_phase: 09
current_phase_name: BotFights Platform Upgrade
status: planning
stopped_at: Phase 10 planned (5 plans, 2 waves)ready to execute; F-01 verified but NOT yet fixed
last_updated: "2026-08-02T10:15:10.221Z"
last_activity: 2026-07-31
last_activity_desc: Phase 02 complete, transitioned to Phase 09
stopped_at: Phase 10 COMPLETE (10-01..10-06); OTA prep in progressdev-pair deploy + macaroon rotation outstanding
last_updated: "2026-08-02T21:30:00.000Z"
last_activity: 2026-08-02
last_activity_desc: 10-06 KEY-05 entropy enforcement shipped; LND macaroon rotation + Tor auto-onion fix
progress:
total_phases: 11
completed_phases: 1
total_plans: 44
completed_plans: 27
total_plans: 45
completed_plans: 30
percent: 9
---
@@ -165,6 +165,6 @@ Decisions are logged in PROJECT.md (10 locked ADRs in the `<decisions>` block +
## Session Continuity
Last session: 2026-08-02T10:15:10.179Z
Stopped at: Phase 10 planned (5 plans, 2 waves) — ready to execute; F-01 verified but NOT yet fixed
Resume file: .planning/phases/10-key-material-hardening/10-01-PLAN.md
Last session: 2026-08-02T21:30:00.000Z
Stopped at: Phase 10 complete; OTA prep — dev-pair deploy + macaroon rotation outstanding
Resume file: .planning/phases/10-key-material-hardening/10-06-SUMMARY.md