docs(10-06): summary — Phase 10 complete, with the gate-effectiveness caveat
All five KEY-05 layers landed. Records the two things a reader would otherwise get wrong: - the 2 boot_reconciler test failures in the full-suite run are parallel-load flakes (4/4 pass in isolation), not regressions; - layer (b)'s clippy gate is LIVE but not yet EFFECTIVE, because 42 pre-existing warnings already fail the same -D warnings step. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 5
parent
a3283cffb4
commit
a850bb6cdd
+9
-9
@@ -5,15 +5,15 @@ milestone_name: milestone
|
||||
current_phase: 09
|
||||
current_phase_name: BotFights Platform Upgrade
|
||||
status: planning
|
||||
stopped_at: Phase 10 planned (5 plans, 2 waves) — ready to execute; F-01 verified but NOT yet fixed
|
||||
last_updated: "2026-08-02T10:15:10.221Z"
|
||||
last_activity: 2026-07-31
|
||||
last_activity_desc: Phase 02 complete, transitioned to Phase 09
|
||||
stopped_at: Phase 10 COMPLETE (10-01..10-06); OTA prep in progress — dev-pair deploy + macaroon rotation outstanding
|
||||
last_updated: "2026-08-02T21:30:00.000Z"
|
||||
last_activity: 2026-08-02
|
||||
last_activity_desc: 10-06 KEY-05 entropy enforcement shipped; LND macaroon rotation + Tor auto-onion fix
|
||||
progress:
|
||||
total_phases: 11
|
||||
completed_phases: 1
|
||||
total_plans: 44
|
||||
completed_plans: 27
|
||||
total_plans: 45
|
||||
completed_plans: 30
|
||||
percent: 9
|
||||
---
|
||||
|
||||
@@ -165,6 +165,6 @@ Decisions are logged in PROJECT.md (10 locked ADRs in the `<decisions>` block +
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-08-02T10:15:10.179Z
|
||||
Stopped at: Phase 10 planned (5 plans, 2 waves) — ready to execute; F-01 verified but NOT yet fixed
|
||||
Resume file: .planning/phases/10-key-material-hardening/10-01-PLAN.md
|
||||
Last session: 2026-08-02T21:30:00.000Z
|
||||
Stopped at: Phase 10 complete; OTA prep — dev-pair deploy + macaroon rotation outstanding
|
||||
Resume file: .planning/phases/10-key-material-hardening/10-06-SUMMARY.md
|
||||
|
||||