docs: defer failed notification artwork until all other work is complete
This commit is contained in:
@@ -679,3 +679,19 @@ menu-enabled. Their broader backend/transport/inheritance work remains open and
|
||||
their end-of-backlog delivery order is retained. Companion agent is now handling
|
||||
Fleet acceptance; paid-file agent owns the next combined isolated backend run
|
||||
after the VM window. Optional archive helper was cancelled; never resume its PID.
|
||||
|
||||
|
||||
### Operator artwork deferral supersedes pending confirmation
|
||||
|
||||
The user reports the notification image still does not appear after deployment,
|
||||
and explicitly requests parking it until the end of all tasks. Retain physical
|
||||
FAIL/open, background playback accepted, and stop further artwork investigation.
|
||||
Backlog task23 records the deferred follow-up after all earlier tasks.
|
||||
|
||||
VM update requests so far hit lifecycle-lock admission before reviewed-plan
|
||||
validation. They prove no mutation, not the missing-plan gate or rollback. Indee
|
||||
agent is tracing actual lock errno/context; startup preservation is still valid.
|
||||
Root/paid agent Fleet provenance fix is isolated in
|
||||
`/tmp/archy-fleet-provenance-20261007`, companion agent Fleet alert/provenance UI
|
||||
is also isolated. Neither is live or compiled into the VM artifact. Their final
|
||||
review/integration must precede the next combined backend source freeze.
|
||||
|
||||
@@ -12,8 +12,9 @@ the delivered Cloud PiP flow on2026-10-07. Audio and video use separate channels
|
||||
Native background audio is operator-confirmed on companion 0.5.37/build57 for
|
||||
the reported background playback and notification flow. The full physical
|
||||
controls, queue, task-removal and recovery matrix remains open. Notification
|
||||
artwork has a qualified dashboard correction deployed on dev and Yaya; physical
|
||||
confirmation remains open. It does not require another APK. Browser and Robolectric
|
||||
artwork remains failed on the physical phone after the qualified dashboard
|
||||
correction was deployed on dev and Yaya. The operator explicitly deferred further
|
||||
artwork work until all other tasks are finished. APK57 remains unchanged. Browser and Robolectric
|
||||
results do not establish phone acceptance.
|
||||
|
||||
## Declare the audio integration
|
||||
@@ -194,8 +195,8 @@ remains open. No definitive cause of the earlier failure is established. USB
|
||||
access is unavailable. The artwork origin correction passes 26 focused dashboard
|
||||
tests, production browser checks at 390/1440px and two native JPEG tests on API
|
||||
28/35. Guarded dashboard deployment and deployed browser checks passed on dev
|
||||
and Yaya (receipt d23da226). Physical artwork confirmation remains pending;
|
||||
these checks do not prove the cover from a particular live track.
|
||||
and Yaya (receipt d23da226). Physical artwork acceptance failed: the operator subsequently reported that the actual phone still shows no cover.
|
||||
Further artwork work is explicitly deferred until the end of all tasks.
|
||||
|
||||
|
||||
Apps continue using the existing version1 app audio protocol above. They do not
|
||||
|
||||
@@ -694,3 +694,14 @@ no implementation or public visibility change is enabled.
|
||||
- Qualify both source choices, tree navigation, whole-library search, retained
|
||||
multi-selection/removal, Send, cross-node receipt/open/download, free and paid
|
||||
access, duplicate/reconnect recovery and responsive/accessibility behaviour.
|
||||
|
||||
|
||||
## 23. Companion notification artwork — operator-deferred until all other tasks
|
||||
|
||||
The operator retested APK0.5.37 with the deployed Yaya artwork UI and reports
|
||||
that the song image still does not show. On 2026-10-07 they explicitly asked to
|
||||
park this until the end of all tasks. Background playback and notification
|
||||
presence remain accepted; artwork is failed/open, not completed by fixture tests.
|
||||
Do not spend further investigation/build/deployment work on artwork ahead of
|
||||
the other tasks. Resume the actual-track authentication/CORS/thumbnail/native
|
||||
notification investigation only at the deferred end, preserving playback.
|
||||
|
||||
Reference in New Issue
Block a user